Cured floor
The construction conditions for the solidified floor coating
The base concrete must be fully cured (with a curing age typically greater than 28 days). The construction environment temperature should be between 5 and 35 degrees Celsius, and ensure good ventilation at the site.
热品推荐 /HOT PRODUCT

Floor coating

Preparation for the use of floor paint

Phone E-mail SMS Map